cement bond log powerpoint

FESAus Monthly Technical Meeting

As the cement bond logs comes in various forms, from basic acoustic logs, to sector logs, to ultrasonic image logs, each having their unique application and benefit, this presentation provides an overview of the various types of tools and logs,

الحصول على السعر

Long Term Stewardship Public Meeting

• Cement Bond Log of PTX061056 Completed • Results indicate the concrete seal at the FGZ is competent. 19. Unexpected Conditions (cont'd) PTX061005 Unexpected Condition • Detection of 1,4dioxane at the cleanup level ( ug/L) ... PowerPoint Presentation Author: Jeff Flora

الحصول على السعر

Deepwater Well Construction 101 RedState

May 22, 2010· On the other hand, BP has been criticized – as in the linked article – for not running a Schlumberger cement bond log to evaluate the condition of the cement. I'm no deepwater drilling expert, but I would have found it a little unusual for them to run this evaluation so soon after cementing the well.

الحصول على السعر

Petroleum and natural gas industries — Well integrity standard

Petroleum and natural gas industries — Well ... poor cement bond log results. 11 . ... Petroleum and natural gas industries Well integrity standard, ISO 165301 Well integrity Lifecycle Governance, 2015 BSEE Domestic and International Standards Workshop Houston May 8 th 2015

الحصول على السعر

WELL CEMENTING

regards oilfield cementation –principally, an excellent bond with both formation and casing and topquality hardened cement slurry between the casing and the formation. Top Quality Cementation is Crucial – Photo Courtesy of World Oil CEMENT PROPERTIES In this section we will review the following: Yield Slurry Density Mixwater

الحصول على السعر

Inflatable Packers Weebly

Inflatable Packers Assuring wellbore integrity, enhancing reservoir management options, and providing ... casing and cement programs be designed so that there is no gas/oil migration into annuli • Cement placement does not always ensure an adequate barrier • In many cases an additional barrier ... • Cement bond log and pressure testing to ...

الحصول على السعر

COGCC Underground Injection Program Induced Seismicity

A cement bond log shall be run on all production casing or, in the case of a production liner, the intermediate casing, when these casing strings are run. These logs and all other logs run shall be submitted with the Well Completion or Recompletion Report and Log, Form 5.

الحصول على السعر

Bonding Agents and Adhesives Euclid Chemical

An extensive line of epoxy adhesives and other polymer bonding agents in low and high modulus variations with multiple viscosities to ensure proper bonding.

الحصول على السعر

Understanding Mechanical Integrity Testing and Underground ...

• Cement evaluation logs provides insight into level of cement bond to the casing and formation as well as cement integrity conditions including: • A wide variety of cement evaluation logs are available each with distinct advantages. • It is vital to understand wellbore conditions to .

الحصول على السعر

Letter to Tony Hayward, BP, June 14, 2010

cement at the bottom ofthe well and the seal at the wellhead on the sea floor. The decision to use insufficient centralizers created a significant risk that the cement job would channel and fail, while the decision not to run a cement bond log denied BP the opportunity to assess the status of the cement job.

الحصول على السعر

SOLUTIONS DRIVEN ENHANCED PRODUCTION .

cementing equipment training, cementing chemistry, wellcementing design, drilling practices, cement bond log analysis, open and cased hole log analysis, advanced fracturing engineering and reservoir evaluation for production analysis. Waste water hazardous and nonhazardous disposal wells, Class I, Class II disposal wells and gas storage wells.

الحصول على السعر

Powerpoint Presentation Templates Of Cement Mills

minemining plant presentation of cement mill ... cement mill PPT Powerpoint Templates, ... mill ppt of cement...Cement Ball Mills PPT | Powerpoint ... Read more cement bond log powerpoint .

الحصول على السعر

Author: MUHAMMAD ZAHID (Applied Geology ...

E)SONIC Sonic Log is a porosity log. In the porous zones the travel time of sound wave is greater. While in compact zone the sound wave travel faster, therefore travel time is less. Where the hole size is large due to caving the density tool cannot read the actual density of rock because density tool is Pad Tool.

الحصول على السعر

Cased Hole Logging: Segmented Cement Bond Tool

Segmented Cement Bond Tool. The SCBT evaluates the cement bond quality and integrity to both pipe and formation by providing the measurements of the cement bond amplitude (CBL) through the near receiver (3ft crystal), and variable density log (VDL) through the far receiver (5ft Crystal). The SCBT tool also provide a cement map through eight...

الحصول على السعر

Essays Part 10

Introduction The Deepwater Horizon oil spill by BP PLC illustrated a weak management approach to the issue of safety for both the company's workforce and the environment. The corporation's failure to run test referred to as the 'cement bond log' during the cementing .

الحصول على السعر

GWPC Mechanical Integrity Workshop Pass

• Indication of pipe to cement bond • Used in determination of cement bond index BI= bond index Afp = free pipe amplitude Als = the measured amplitude A = what is considered to be bonding () ( ) log( ) log( ) log( ) log( ) A A A A BI A A A A BI fp fp ls linear fp fp ls 52

الحصول على السعر

Case Study Free Sample

Introduction The Deepwater Horizon oil spill by BP PLC illustrated a weak management approach to the issue of safety for both the company's workforce and the environment. The corporation's failure to run test referred to as the 'cement bond log' during the cementing .

الحصول على السعر

CEMENT BOND LOG INTERPRETATION: WELLOG

Oct 15, 2009· Acoustic energy is absorbed when cement is in contact with the casing and formation. CEMENT BOND LOG INTERPRETATION: In general terms, A high signal amplitude indicates poor cement bond. A low signal amplitude indicates good cement bond. Amplitude is normally presented on a scale of 0 to 100 percent amplitude.

الحصول على السعر

California Division of Oil, Gas, Geothermal Resources ...

•Temperature and noise log – no unexplained anomalies top of cement in tubing = 8199' MD •Cement bond log annular TOC = 7610' MD •Positive pressure test, held 900 psi for 70 minutes, loss = % 11

الحصول على السعر

Cement Bond Log MIT?

The cement bond log is very good at showing the top of cement; it is ordinarily easy to pick the top from the amplitude curve generated from any single receiver tool. So an operator can run a "cement top log" and submit the results as a variation of the cement records MIT contemplated at 40 CFR §(c)(2). The distinction here is not trivial.

الحصول على السعر

(DOC) BP and the Deepwater Horizon Disaster of 2010 ...

Workers from Schlumberger had been hired to perform a cement bond log if needed,61 but on the morning of Tuesday, April 20, about 12 hours before the blowout, BP told the Schlumberger workers their services would not be needed. 62 According to Schlumberger's contract, BP would pay a cancellation fee equal to 7% of the cost of having the cement bond log and mechanical plug services completed.

الحصول على السعر

Logging cased hole

Little temperature variation with the formation may make cement top difficult to see. CBL (cement bond log) Best results after 3 days or when cement has developed 70%+ of the compressive strength. These tools may be too large for slim hole wells. Gravelpack logging (GR) Tool response depends on density difference between cement and annular fluid.

الحصول على السعر